Categories
Materials
Basic materials
Cement
Aggregates
Stone
Composite material
Bricks
Cement pipes
Floor tiles
Steel
Re-bars
RHS profiles
SHS profiles
Tubular profiles
LTZ profiles
Metal sheets
Wood
Contracting
Earth works
Site clearing
Bulk excavation
Trench excavation
Pit excavation
Cart away
Backfill
Masonry works
Stone
Bricks
Hollow Blocks
Concrete works
Concrete
Formwork
Re-bars
Roofing
Covering
Water Proofing
Down pipe
Finishing works
Plastering
Screed
Painting
Flooring
Skirting
Wall cladding
Doors and windows
Carpentry
Sanitary
Electrical
Mechanical
Machinery
Labour
Search Under:
Contracting
Price watch
Contracting
Total Results:
95
Page
1
2
3
4
of 4
Click on price to view Price History
Item.
Descrition
Unit
Price/Unit
(ETB)
1.1.1
Site Clearing to an average of 20 cm
m2
5.10
1.2.1
Bulk excavation in mixed soil to a depth not exceeding 150 cm
m3
-
1.2.2
Bulk excavation in mixed soil to a depth exceeding 150 cm up to 300 cm
m3
-
1.2.3
Bulk excavation in mixed soil to a depth exceeding 300 cm up to 450 cm
m3
-
1.2.4
Bulk excavation in weathered rock to a depth not exceeding 150 cm
m3
-
1.2.5
Bulk excavation in weathered rock to a depth exceeding 150 cm up to 300 cm
m3
-
1.2.6
Bulk excavation in weathered rock to a depth exceeding 300 cm up to 450 cm
m3
-
1.2.7
Bulk excavation in hard rock to a depth not exceeding 150 cm
m3
25.80
1.2.8
Bulk excavation in hard rock to a depth exceeding 150 cm up to 300 cm
m3
-
1.2.9
Bulk excavation in hard rock to a depth exceeding 300 cm up to 450 cm
m3
-
1.3.1
Trench excavation in ordinary soil to a depth not exceeding 150 cm
m3
-
1.3.2
Trench excavation in mixed soil to a depth exceeding 150 cm up to 300 cm
m3
-
1.3.3
Trench excavation in mixed soil to a depth exceeding 300 cm up to 450 cm
m3
-
1.3.4
Trench excavation in weathered rock to a depth not exceeding 150 cm
m3
-
1.3.5
Trench excavation in weathered rock to a depth exceeding 150 cm up to 300 cm
m3
-
1.3.6
Trench excavation in weathered rock to a depth exceeding 300 cm up to 450 cm
m3
-
1.3.7
Trench excavation in hard rock to a depth not exceeding 150 cm
m3
80.40
1.3.8
Trench excavation in hard rock to a depth exceeding 150 cm up to 300 cm
m3
-
1.3.9
Trench excavation in hard rock to a depth exceeding 300 cm up to 450 cm
m3
-
1.4.1
Pit excavation in ordinary soil to a depth not exceeding 150 cm
m3
32.40
1.4.2
Pit excavation in mixed soil to a depth exceeding 150 cm up to 300 cm
m3
39.90
1.4.3
Pit excavation in mixed soil to a depth exceeding 300 cm up to 450 cm
m3
47.30
1.4.4
Pit excavation in weathered rock to a depth not exceeding 150 cm
m3
-
1.4.5
Pit excavation in weathered rock to a depth exceeding 150 cm up to 300 cm
m3
-
1.4.6
Pit excavation in weathered rock to a depth exceeding 300 cm up to 450 cm
m3
-
1.4.7
Pit excavation in hard rock to a depth not exceeding 150 cm
m3
283.00
1.4.8
Pit excavation in hard rock to a depth exceeding 150 cm up to 300 cm
m3
346.00
1.4.9
Pit excavation in hard rock to a depth exceeding 300 cm up to 450 cm
m3
-
1.5.1
Cart away and spread surplus excavated material and deposit to appropriate tip
m2
44.70
1.6.1
Backfill with excavated material
m3
-